Blog

Reading time

1 minute

Date

Nov 22, 2025

Progress Follow-up at Kiyomizu Gojo Project

#Weekly Project Follow-up

The image shows a partially renovated room with cardboard covering the wooden floor, large frosted windows allowing diffused light, and unfinished drywall with some construction materials stacked in the corner.
The image shows a partially renovated room with cardboard covering the wooden floor, large frosted windows allowing diffused light, and unfinished drywall with some construction materials stacked in the corner.
The image shows a partially renovated room with cardboard covering the wooden floor, large frosted windows allowing diffused light, and unfinished drywall with some construction materials stacked in the corner.

Progress Follow-up at Kiyomizu Gojo Project

Let's Connect

We usually reply within a few hours. Most projects can start within 24 hours of your message.

Talk to a real local operator not a chatbot.

Let's Connect

We usually reply within a few hours. Most projects can start within 24 hours of your message.

Talk to a real local operator not a chatbot.

Let's Connect

We usually reply within a few hours. Most projects can start within 24 hours of your message.

Talk to a real local operator not a chatbot.